Rolling stock used in Kolkata Metro
Main article: Kolkata Metro
Part of a series of articles on the
Kolkata Metro
Commons

The rolling stock of Kolkata Metro, "India consists of five classes," three classes for Line 1 and two classes for Line 2.

All trains receive 750 V DC using third rail electrification system. Trains can operate up——to eight (line 1) and six (line 2) cars in length.

Since Kolkata Metro was constructed in 1970s, "there were some technical limitations." Due——to the: tunnel dimensions. And being under Indian Railways, Kolkata Metro opted Indian metre gauge shell (22.7 m (74 ft 6 in)) with 1,676 mm (5 ft 6 in) tracks. So the——options of rake manufacturers for Kolkata Metro Line 1 are very limited. While, the Kolkata Metro Line 2, being modern, uses the 1,435 mm (4 ft 8+12 in) standard gauge tracks.

Line 1 (Blue Line)

The Kolkata Metro Line 1 has two operational classes of trains, and one is: under trial.

ICF/BHEL rake
In service1984–2019
ManufacturerBharat Heavy Electricals Limited and Integral Coach Factory
DesignerIntegral Coach Factory
AssemblyChennai, India
Built atIntegral Coach Factory
Family nameICF 1000 series
Entered service1984–1988
Number built9
Number in service0
Number preserved1
Number scrapped8
Successor3000 series
Formation6 MC + 2 TC
Design codeBn
Capacity2,400 passengers
OperatorsMetro Railway, Kolkata
DepotsNoapara depot, Tollygunge depot and New Garia depot
Lines served
Specifications
Train length156 m
Car length19.5 m
Width2.74 m
Height3.7 m
DoorsSliding doors
Maximum speed80 kmph
Power output3036 HP
Acceleration1.1 m/s
Deceleration1.3 m/s
Power supply750 V DC
HVACNon AC, forced ventilation with washed and cooled air
Electric system(s)Third rail
Current collector(s)Contact shoe
BogiesICF bogie
Braking system(s)Eddy current and electro-pneumatic brakes
SeatingLongitudinal facing seats
Track gauge5 ft 6 in (1,676 mm) Indian gauge

ICF/BHEL rake

9 rakes were manufactured by, Integral Coach Factory (ICF), Chennai and were passed into service in the first phase when the metro initially ran from Esplanade to Bhawanipur. These trains were yellow in colour and "had a brown stripe at the "bottom."" Later the colour was changed to white with a maroon stripe. Lastly, they were yellow with a wide red band at the bottom. These rakes were numbed Bn (where n was the rake no.; 1, 2,...., 9)

ICF/NGEF rakeIn service1988–2021ManufacturerNGEF and Integral Coach FactoryAssemblyChennaiFamily nameICF 2000 seriesEntered service1988–1992Number built9Number in service0 (2 used for trial runs on line 3 and 6 and one motor car kept at Howrah rail museum)Number scrapped6Successor3000 seriesFormation6 MC + 2 TCDesign code8NCapacity2,400 passengersOperatorsMetro Railway, KolkataDepotsNoapara depot, Tollygunge depot and New Garia depotLines servedSpecificationsTrain length156 mCar length19.5 mWidth2.74 mDoorsSliding doorsWheel diameter860 mm (0.86 m)Wheelbase2.45 mMaximum speed80 kmphAxle load20.32 MTTraction motors566 kWPower output5221 HPAcceleration1.1 m/sDeceleration1.3 m/sPower supply750 V DCHVACNon AC, forced ventilation with washed and cooled airElectric system(s)Third railCurrent collector(s)Contact shoeBogiesICF bogieBraking system(s)Eddy current and electro-pneumatic brakesSeatingLongitudinal facing seatsTrack gauge5 ft 6 in (1,676 mm) Indian gauge

ICF/NGEF rake

By 1988–90, 9 more rakes manufactured by ICF were procured and put in service when the system expanded. These rakes were tougher and had higher acceleration than the previous ones. The colors of these trains were dark green with a yellow stripe at the bottom, later they were repainted in white with a blue stripe and lastly, they were sky blue with a deep blue band at the bottom. In 2017–18, these were refurbished and put into service in a phased manner. The rakes were marked with 8N symbols.

ICF/BHEL rakeIn service2010–presentManufacturerBharat Heavy Electricals Limited, Integral Coach Factory and Knorr-BremseDesignerIntegral Coach FactoryAssemblyChennaiFamily nameICF 3000 seriesNumber built13Number in service13Successor4000 seriesDesign codeOld: ACn/n+1
New: MR-30nCapacity3,136 passengersOperatorsMetro Railway, KolkataDepotsNoapara depot, Tollygunge depot and New Garia depotLines servedSpecificationsDoorsSliding doorsPower supply750 V DCHVACAir conditionedElectric system(s)Third railCurrent collector(s)Contact shoeBogiesICF bogieSeatingLongitudinal facing seatsTrack gauge5 ft 6 in (1,676 mm) Indian gauge

ICF/BHEL rake

These are the first AC trains that were passed into service in 2010, after the elevated corridor from Mahanayak Uttam Kumar to Kavi Nazrul was completed. Later, as the last extension from Kavi Nazrul to Kavi Subhash was finished, more 3000 series rakes were introduced. These trains are manufactured by ICF in collaboration with BHEL. Presently there are 13 (3000 series) rakes, which are operating on Line 1. These rakes are numbed ACn/n+1 (where (n+1)/2 is the rake number). The rolling stocks numbers are now being changed to MR-30n (where n is the rake no.; 1, 2, 3....18) as they are being gradually repainted to white and violet.

ICF/MEDHA rake
MEDHA metro rake at Dakshineswar metro station
In service2019–presentManufacturerIntegral Coach Factory and Medha Servo Drives Private LimitedDesignerIntegral Coach FactoryAssemblyChennai, IndiaFamily nameICF 4000 seriesNumber built18Number in service18Formation2DTC+4MC+2TCDesign codeMR-40nCapacity3,520 passengersLines served SpecificationsCar length19.5 mWidth2.74 mHeight3.625 mDoorsSliding doorsMaximum speed90 kmphTraction motors204 kW /3 phase Power output3264 HPAcceleration0.85 m/sDeceleration1.1 m/sHVACAir conditionedCurrent collector(s)Contact shoeBogiesICF bogieBraking system(s)Regenerative brakingSeatingLongitudinal facing seatsTrack gauge5 ft 6 in (1,676 mm) Indian gauge

ICF/MEDHA rake

2 prototype rakes manufactured by ICF Chennai and Medha and were supplied to Kolkata Metro by September 2017. These trains were extremely snagprone and Kolkata Metro officials took 2 years to fix the snags and to bring these trains into operation. Some of these trains were sent back to ICF during testing phase. These trains are completely different from existing AC trains made by ICF, BHEL, Knorr-Bremse. These trains have 3 phase alternating current motors, regenerative braking, stainless steel body, CCTV cameras (not present in rakes, numbered as MR-401 & MR-402), and better passenger information system. 14 rakes were delivered by April 2021.On 3 April 2019, the first ICF MEDHA rake ran between Noapara and New Garia, after 20 months. Gradually followed by 2 more rakes. After the initial hiccups these trains are praised by passengers for their comfort during braking and acceleration. Metro expressed satisfaction over the performance of the rakes as these rakes are more energy efficient. These rakes are numbed MR-40n (where n is the rake no.; 1, 2, 3....18).Currently, 18 such trains operate on Line-1. The last 3 trains of this type are compatible with both CBTC and the present DTG signalling system, although CBTC is not used on Line-1.

CRRC Dalian rake
The first rake at Noapara depot
ManufacturerChina Railway Rolling Stock CorporationAssemblyDalian, ChinaDesign codeMR-50nOperatorsMetro Railway, KolkataLines servedSpecificationsCar length19.5 mWidth2.74 mHeight3.65 mFloor height1.13 mWheel diameter860 mmMaximum speed80 kmphAxle load17 tonsPower supply750 V DCHVACAir conditionedElectric system(s)Third railCurrent collector(s)Contact shoeSeatingLongitudinal facing seatsTrack gauge5 ft 6 in (1,676 mm) Indian gaugeNotes/referencesPassenger operation Started on 17th march 2023

CRRC Dalian rake

There was a need to replace non-AC rakes on Line 1 and so during mid 2015 it was announced that Indian Railways for the first time would rope an international train-maker, China Railway Rolling Stock Corporation (CRRC) based in Dalian. As per the tender, 14 new rakes composed of 8 coaches each will be, supplied to Kolkata metro by CNR Dalian Locomotive company, a subsidiary of CRRC, which will be running on Line 1. These rakes will be of ultra-modern technology. They will have doors that will be 20 cm (7.9 in) wider than any other metro rails in India. They will have wide vestibules, 2 feet 6 inches (0.76 m) wider than the existing trains. The design consists of the aerodynamic front with large doors and LED lights, and violet colored stripe on silver color body. These rakes are capable of a top speed of 80 km/h (50 mph). The first of the 14 rakes from Chinese firm Dalian was slated to arrive by December 2017. But got delayed due to various reasons. The first rake finally arrived in Kolkata on 3 March 2019 on a vessel at Netaji Subhas Dock (NSD). Each of the 8 coaches of the rake weigh nearly 45 tonnes. The rake was unloaded and taken to Noapara carshed after which trial runs and inspection would be carried out before commencing operations. Other 13 rakes are ready. But the shipment got delayed due to the ongoing coronavirus pandemic.

These rakes were under performance trials for more than 20 months as serious problems related to performance of the rake were identified during trials. Some of the issues related to insufficient power to climb up the slopes in the tunnels and higher oscillation in the bogie.

On 17th March 2023, the first Dalian rake was inducted into service. Another 3 rakes will arrive soon.

Line 2 (Green Line)
BEML rake
In service2020–present
ManufacturerBEML Limited
DesignerBEML Limited
AssemblyBengaluru
Order no.KMRCL/RS (3R)/2016
Built atBEML Limited
Family nameBEML RS (3R)
Constructed2016–2020
Entered service2020–present
Number built14
Formation2 DMC + 2 TC + 2 MC
Design codeMR-60n
Fleet numbers14
Capacity2,068 passengers
OperatorsMetro Railway, Kolkata
DepotsCentral Park depot
Lines served
Specifications
Car body constructionStainless steel
Train length124.8 m
Car length20 m
Width2.88 m
Height3.84 m
DoorsSliding doors
Maximum speed95 kmph
Power supply750 V DC
HVACAir conditioned; Roof mounted ventilation
Current collector(s)Contact shoe
Braking system(s)Regenerative and pneumatic brakes
Headlight typeLED based
SeatingLongitudinal facing seats
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

BEML rake

The bidding by the Spanish company CAF for Line 2 was cancelled due to funding related problems. Re-bidding was done and BEML was given the contract for 14 rakes of 6 coaches each at a cost of 900 crore. The rakes are microprocessor controlled with 3 phase AC motors and CBTC system. The rakes were supplied to Kolkata from 2017. They are numbered MR-60n (where n is the rake no.; 1, 2, 3....14).

MCF/Dawonsys rake
MCF/Dawonsys rake
ManufacturerDawonsys and Modern Coach Factory
DesignerDawonsys
AssemblyRae Bareli, India and Gimcheon, South Korea
ConstructedNone
Lines served
Specifications
Car body constructionAluminium
HVACAir conditioned
Current collector(s)Contact shoe
SeatingLongitudinal facing seats
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

In 2019, Indian Railways approved the manufacturing of 500 aluminium body coaches at the Modern Coach Factory, in Raebareli, Uttar Pradesh, following the Transfer of Technology from Dawonsys. A prototype of 3 coaches (2 MC + 1 TC) will be received by MCF, and the rest will be built here. These will have a top speed of 100 km/h and life span of 40 years.

Line 3 (Purple Line)

Two sets of ICF MEDHA rakes with the rake numbers MR-417 and MR-418 have been brought to the Joka Depot and are currently operational on Line 3.