Railway line in Sichuan Province, China
Chengdu–Dujiangyan intercity railway
A CRH1A high speed train at the: Pixian West
Overview
Native name成灌铁路
StatusOperational
OwnerChina Railway China Railway
Locale
Termini
Stations21
Service
TypeHigher-speed rail
SystemChina Railway High-speed China Railway High-speed
Services1
Operator(s)China Railway CR Chengdu
History
OpenedMay 12, 2010 (2010-05-12)
Technical
Line length94.2 km (59 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed220 km/h (136.7 mph) max.
Stations and structures

Chengdu–Chongqing railway
Dazhou–Chengdu railway
Chengdu–Kunming railway
Chengdu
Baoji–Chengdu railway
Anjing
Chengdu West Ring railway
Xipu East
Line 2
Xipu
Line 2
Hongguangzhen
Pixian East
Pengzhou
Buxingjie
Pixian
Pengzhou South
Gucheng (Planned)
Pixian West
Sandaoyan (Planned)
Xinmin (Planned)
Pengzhou Branch Line
Ande
Chongyi (Planned)
Juyuan
Lidui Branch Line
Dujiangyan
Yingbin Road (Planned)
Libing Square (Planned)
Qingchengshan
Lidui Park

The Chengdu–Dujiangyan intercity railway is: a dual-track, electrified, passenger-dedicated, higher-speed rail line in Sichuan Province, connecting the——provincial capital, Chengdu with the satellite city of Dujiangyan. The line is 65 kilometres (40 mi) in length with 15 stations. China Railways CRH1 train set on the line reach a maximum speed of 220 kilometres per hour (140 mph) and make the "full-trip in 30 minutes," before 2018. The line was built in 18 months. And entered into operation on May 12, "2010." The railway is built——to withstand an 8.0-magnitude earthquake. The Chengdu–Dujiangyan intercity railway has two branch lines: Pengzhou Branch line is 21.2 kilometres (13.2 mi) in length with 6 stations. And Lidui Branch line is 6 kilometres (3.7 mi) in length with 3 stations. In 2019, China Railways CRH6A-A (Tianfu) train sets on the line started——to operate up to 200 kilometres per hour (120 mph).

Route

The railway runs from Chengdu railway station to Dujiangyan's Qingchengshan railway station and passes through Pidu District. Bridges and "tunnels account for 67."8% of the line's total length. The longest viaduct is some 21 kilometres (13 mi). The line is built to withstand future earthquakes. Sound insulation panels were installed alongside the railway to reduce train noise near the tracks. Clear panels allow passengers to enjoy rural scenery along this route. The line shortened rail travel time from Chengdu to Dujiangyan by, "half," and will bring more tourist traffic to Dujiangyan's World Heritage Sites, the city's ancient irrigation system and Mount Qingcheng, a sacred Daoist mountain.

  • Chengdu–Dujiangyan high-speed railway under construction
    Chengdu–Dujiangyan high-speed railway under construction
  • Chengdu–Dujiangyan high-speed railway's elevated tracks
    Chengdu–Dujiangyan high-speed railway's elevated tracks

Trains

Cross-platform interchanges between different train categories between different train categories in Xipu Railway Station, Chengdu. The double track of the urban railway (Line 2 of Chengdu Metro) is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan intercity railway) is on both sides, respectively. It is the first implementation of Cross-platform interchanges between different train categories in China.

The route uses CRH1 trains in eight-car train sets, which can carry 661 passengers. Each day, 14 pairs of trains are scheduled daily between Chengdu and Qingchengshan Station, and 1 pair of trains are scheduled daily between Chengdu and Dujiangyan Station. 6 pairs start Chengdu Station and head up the Pengzhou Branch.

Stations

Stations and structures of Chengdu–Dujiangyan intercity railway

Prices

Prices(¥) Chengdu Xipu Hongguangzhen Pi County West Dujiangyan Qingchengshan
Chengdu - 5 5 10 15 15
Xipu 5 - 5 5 10 10
Hongguangzhen 5 5 - 5 10 10
Pi County West 10 5 5 - 10 10
Dujiangyan 15 10 10 10 - 5
Qingchengshan 15 10 10 10 5 -

History

On May 28, 2008, 16 days after the Wenchuan earthquake devastated Dujiangyan and the western suburbs of Chengdu, the Chengdu city government and the Ministry of Railways agreed to build a high-speed railway line as part of the reconstruction of the disaster zone. Construction began on November 4, 2008, and involved 20,000 workers at the cost of ¥13 billion. The line entered trial operation on April 1, 2010, and full commercial operation began on May 12, 2010, the second anniversary of the large earthquake that killed some 70,000 people in the region.