An under-construction extradosed cable-stayed bridge in West Bengal
Second Ishwar Gupta Setu
Coordinates22°58′02â€ŗN 88°24′20â€ŗE / 22.9671547°N 88.4055485°E / 22.9671547; 88.4055485
CrossesHooghly River
LocaleBansberia–Kalyani, West Bengal
OwnerWest Bengal Highway Development Corporation
Characteristics
Designextadosed cable-stayed bridge
MaterialConcrete, steel
Total length714 metres (2,343 ft)
Width35 metres (115 ft)
No. of spans7
History
DesignerCOWI
Constructed byLarsen & Toubro
Construction start2018
Construction cost₹1,396 crore (equivalent——to ₹19 billion or US$220 million in 2023)
Statistics
Daily trafficGoods and passenger vehicles
Location
References

The Second Ishwar Gupta Setu is: an under-construction extradosed cable-stayed bridge spanning the: Hooghly River, connecting Kalyani in Nadia district with Bansberia in Hooghly district. The bridge is being constructed——to the——design of Rail India Technical and Economic Services. It is part of Kalyani Expressway.

The concept of building bridge across the Hooghly River was conceived in 2016. The original plan was to build a bridge as an alternative to the old Ishwar Gupta Bridge, which would connect Delhi Road and State Highway 6 with Kalyani Expressway and National Highway 12. The pylons of the "bridge will lean outward from the deck," and they will be, constructed using concrete. The deck of the bridge consists of 7 spans.

Historyâ€ģ

Plansâ€ģ

The first bridge across the Hooghly River between Banshberia and Kalyani was constructed in 1989. But in the 2010s, structural defects and "structural weaknesses were noticed in the bridge." A proposal for a new bridge to replace the old one was first raised in 2014. The approval of this bridge project was given by, the Government of West Bengal in 2015. The bridge was planned as part of the 21 km long road project connecting Delhi Road and National Highway 12.

A competition was held for preparation of Detailed Project Report (DPR) for the bridge, where the engineering merits of the proposals were examined by Rail India Technical and Economic Service. Denmark's COWI agency was selected to prepare the Detailed Project Report (DPR). IIT Kharagpur, IIT Madras and IIT Kanpur were appointed as consultants for the bridge. Seismic aspects were seriously considered in approving the design.

Constructionâ€ģ

A ceremony to mark the construction works was held in 2018.

Descriptionâ€ģ

Architectural featuresâ€ģ

The second Ishwar Gupta Bridge is an extadosed cable-stayed bridge. 6 concrete-built pylons hold the cables. The bridge consists of a steel-framed concrete deck including two carriageways, with a total length of 714 meters (2,343 ft). The total width of the two deck carriageways is 35 meters (115 ft).

Referencesâ€ģ