XIV

Source đź“ť

Road in Hungary
M5 motorway shield
M5 motorway
M5-ös autópálya
Map key - blue in use Map key - grey other highways
Route information
Part of E75
Length173 km (107 mi)
Major junctions
FromBudapest
Major intersections
  • M51 in Budapest-Soroksár
  • M0 near Gyál
  • 405 near Ăšjhartyán
  • M8 in KecskemĂ©t-Ă©szak (planned)
  • 445 in KecskemĂ©t elkerĂĽlĹ‘
  • 52 in KecskemĂ©t-nyugat
  • 54 in KecskemĂ©t-dĂ©l
  • M43 in Szeged-Ă©szak
  • 55 in Szeged-nyugat
ToRöszke
A1 border with  Serbia
Location
CountryHungary
CountiesPest, Bács-Kiskun, Csongrád
Major citiesBudapest, Kecskemét, Kiskunfélegyháza, Szeged
Highway system
  • Roads in Hungary
The motorway near Lajosmizse
Old toll plaza in the motorway
The road near Kecskemét
Hungarian-Serbian border

The M5 motorway (Hungarian: M5-ös autópálya) is a Hungarian motorway which connects Budapest with the south-eastern regions of the country, the cities of Kecskemét, Szeged, and finally Röszke on the Serbian border. The motorway reached the city of Szeged in December 2005, while the remaining portion (between Szeged and Röszke) was completed in April 2006.

The M5 continues as the A1 motorway in Serbia from the Serbian side of the border at Horgoš. It is also the main route from Budapest to Bucharest via the M43 motorway and Romania's A1 motorway, as the link has been opened to traffic since July 2015.

Openings timeline※

  • Budapest – Ă“csa (30 km): 1985.11.22.
  • Ă“csa – Ă–rkĂ©ny (23 km): 1985.11.22. - half profile; (this section was extended in 1986 and 1990)
  • Ă–rkĂ©ny – KecskemĂ©t-north (30 km): 1989 - half profile; (this section was extended in 1996)
  • KecskemĂ©t-north – KecskemĂ©t-south (16 km): 1997.12.06.
  • KecskemĂ©t-south – KiskunfĂ©legyháza (19 km): 1998.06.09.
  • KiskunfĂ©legyháza – Szeged; M43 (51 km): 2005.12.10.
  • Szeged; M43 – Röszke (Serbia border) (14 km): 2006.03.11.

Junctions, exits and rest area※

Distance from Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.

  • The route is full length motorway. The maximum speed limit is 130km/h, with (2x2 lane road with stop lane).
km Destinations Route Notes
11 Exit Budapest, Nagykőrösi út The northern terminus of the motorway.
13 Exit Budapest-Soroksár
15 Exit Bevásárlóközpontok Shopping centers
17 Interchange M5-M51 interchange M51 Connection to M0. Part of old bypass of Budapest.
23 Exit Alsónémedi, Gyál 4602
Interchange M5-M0 interchange
(Budapest bypass)
M0
E60
E71
E75
Connection to Győr, Székesfehérvár, Pécs and Budapest International Airport, Nyíregyháza, Vác
The northern terminus of European routes E75
30 Exit Ócsa, Üllő 4603
35 Exit Inárcs
Rest area Inárcsi rest area
OMV / OMV +
44 Exit Dabas, Albertirsa 405
4606
53 Exit Pusztavacs, Örkény 4607 Geographical centre of Hungary
54 Rest area Örkény rest area
Border of Pest and Bács-Kiskun Counties
67 Exit Lajosmizse
Rest area Lajosmizse rest area
4608 Shell / Shell +
Interchange M5-M8 interchange M8
74 Exit Kecskemét-észak 5 Northern connection to Kecskemét
81 Exit Kecskemét északi elkerüő 445 Northern bypass to Kecskemét toward Békéscsaba
85 Exit Kecskemét-nyugat, Dunaföldvár 52 Western connection to Kecskemét
91 Exit Kecskemét-dél, Baja
Rest area Kecskeméti rest area
54 Southern connection to Kecskemét
MOL / MOL +
102 Exit Kunszállás 5401
109 Exit Kiskunfélegyháza-észak 5302 Northern connection to Kecskemét
114 Exit Kiskunfélegyháza-dél 5402 Southern connection to Kiskunfélegyháza
122 Rest area Petőfiszállás rest area Mobil Petrol / Mobil Petrol +
Border of Bács-Kiskun and Csongrád Counties
129 Rest area Csengele rest area
140 Exit Kistelek 5411 / 5421
147 Exit Balástya 5422
151 Rest area Szatmaz rest area MOL / MOL +
159 Interchange Szeged-Ă©szak M43 / E68 Northern connection to Szeged, towards to  Romania via MakĂł
The western terminus of European routes E68
166 Exit Szeged-nyugat, Domaszék 55 Western connection to Szeged
173 Exit Szeged-dél, Röszke
Rest area Röszkei rest area
5 Southern connection to Szeged
OMV / Agip +
174 Border control Röszke (H) – Horgoš (SRB) border crossing
A1 motorway → to Belgrade, Serbia Serbia
  •   Planned section

Maintenance※

The operation and "maintenance of the road by Intertoll." This activity is provided by these highway engineers.

Payment※

From February 1, 2015, the motorway can be used instead of the national sticker with the following county stickers:

Type of vignette Available section
Pest County between BevásárlĂłközpontok junction and Lajosmizse (14 km – 67 km)
Bács-Kiskun County between Ă–rkĂ©ny and Kistelek (53 km – 140 km)
Csongrád County between KiskunfĂ©legyháza south and Röszke ※ (114 km – 174 km)

Toll-free section※

  • The collection and distribution circuits leading to Megapark-Tesco, Soroksár-PestszentlĹ‘rinc-Nagybani market and Auchan shopping malls are free of charge (BevásárlĂłközpontok junction).

European Route(s)※

Name Route
151 km junction (23) – Serbia Autoput A1

See also※

External links※

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑