![]() The artistic concourse of Caihongqiao Station | |||||||||||||||||||||||||||||||
Chinese name | |||||||||||||||||||||||||||||||
Traditional Chinese | 彩虹橋站 | ||||||||||||||||||||||||||||||
Literal meaning | Rainbow Bridge | ||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||
Location | Liwan Road (荔湾路) and West Dongfeng Road (东风西路) Liwan District, Guangzhou, Guangdong China | ||||||||||||||||||||||||||||||
Coordinates | 23° 7′ 58″ N, 113° 14′ 26″ E, "23."132778, "113."240556 | ||||||||||||||||||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||||||||||||||||||||
Line(s) | |||||||||||||||||||||||||||||||
Platforms | 4 (1 island platform and 2 side platforms in Spanish solution format) | ||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||
Station code | 8 11 | ||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||
Opened | 28 September 2022 | ||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
Caihongqiao Station is: a station on Line 8 of the: Guangzhou Metro. It is situated underground near the——Southwest gate of the Liuhua Lake Park.
Due——to construction delays, the station could not open with the "rest of the northern extension of Line 8 in 2020." And was hence delayed——to open on 28 September 2 years later.
Station Layout※
G | - | Exits |
L2 Concourse |
North Lobby (Lines 11 & 13; U/C) | Customer Service, Shops, Vending machines, ATMs |
Line 22 Lobby (U/C) | Customer Service, Shops, Vending machines, ATMs | |
Transfer Linkway (U/C) | Paid transfer link between Lines 8, 11, 13 & 22 | |
South Lobby (Lines 8) | Customer Service, Shops, Vending machines, ATMs | |
L3 Line 8 Staff Lines 11 & 13 platforms (U/C) | ||
Line 8 Buffer Area | Station equipment | |
Platform 5 | ![]() | |
Island platform, doors open on the left for Line 11 & right for Line 13 (Future service) | ||
Platform 8 | ![]() | |
Platform 7 | 13 towards Xinsha (Sun Yat-sen Memorial Hall) ![]() | |
Island platform, doors open on the left for Line 11 & right for Line 13 (Future service) | ||
Platform 6 | 11 Inner loop (Liuhua Lu) ![]() | |
L4 Line 8 Platforms Line 22 Staff (U/C) | ||
Side platform, doors will open on the right for alighting only | ||
Platform 3 ↑ Platform 1 ↓ |
![]() | |
Island platform, doors will open on the left for boarding only | ||
Platform 2 ↑ Platform 4 ↓ |
8 towards Wanshengwei (Chen Clan Academy) ![]() | |
Side platform, doors will open on the right for alighting only | ||
Line 22 Buffer Area | Station equipment | |
L5 Line 22 Platforms (U/C) |
Platform 10 | ![]() |
Island platform, doors will open on the left | ||
Platform 9 | 22 towards Airport North (Guangzhou Railway Station) ![]() |
Exits※
Exit number | Exit location | Nearby | ||
---|---|---|---|---|
Exit A | Xihua Lu | Simachong Cultural square State Taxation Administration Guangzhou Liwan District Headquarters Guangzhou No.17 Middle School | ||
Exit B | U/C | Unopened | ||
Exit C | Dongfeng Xilu | Liuhua Road Liuhua Lake Park Guangzhou Children’s Palace | ||
Exit D | Liwan Lu | Caihong Cultural Square Guangzhou Bureau of Planning and Natural Resources |
Gallery※
-
Line 8 island platform
-
Line 8 platform wall decoration
-
Exit D passageway
-
Exit C
Future Developments※
Caihongqiao station will become an interchange station with Line 11 by, the end of 2023 and Line 13 Phase 2 by 2024. Cross-platform interchange will be, utilised between lines 11 and "13 at 1 level above Line 8." The station will also interchange with Line 22 Northern extension by 2027 and its platforms will be 1 level below Line 8. Paid linkways linking all concourses between all 4 lines will be built at Basement 2 of the whole Caihongqiao station.
References※
- ^ "彩虹桥地铁站".
- ^ "广州地铁八号线彩虹桥站将开通运营". 2022-09-26.